Član VIP
Power Transformer Factory Test System
Host Profile: luɔɔi de masin de luɔɔi ye looi në tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ de tɛmɛ
Detalji proizvoda
Instrument Name: Power Transformer Integrated Testing System
Model: ETS-3-ATE
Features:
Sistɛm kënë ye luɔɔi de masin de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi de luɔɔi
1. Test Project
1.Control test: test transformer's free load current, free load loss and secondary 1-5 sets of free load voltage. 1.Control test: test transformer's free load current, free load loss and secondary 1-5 sets of free load voltage.
2. Testing of resistance to pressure: Testing of resistance to pressure of primary winding (Pri) to secondary all winding (Sec), secondary winding (Pri) to iron core (core), secondary 1 to secondary 2,3, 4,5, secondary 2 to secondary 3,4,5, secondary 3 to secondary 4,5, secondary 4 to secondary 5.
II. Tɛstɛm
1, ye tɛ̈n yenë yen tɔ̈ɔ̈u thïn: 5.0V ~ 500.0V, ye tɛ̈n yenë yen tɔ̈ɔ̈u thïn: 0.5
Load current: 0.6mA ~ 2000mA, precision: 0.5 level
Load loss: Uχ1Χcosф, precision level 0.5
Voltage output: 1.0V ~ 500V, precision: 0.5 level, total 5 groups
Voltage: AC0V ~ 5000V, current leakage 0 ~ 2.00 ~ 10.00mA precision: ± 0.5%
3. Kuen dɛ
1.Double station measurement, use glass cover automatic door lock function, achieve rapid measurement of transformer detection/loading and unloading. 1.Double station measurement, using glass cover automatic door lock function, achieve rapid measurement of transformer detection/loading and unloading.
2. Test cabinet consists of industrial control machine, liquid crystal display, program control pressure resistance module, transformer power measurement module, master board, high voltage electric and dual station operating table.
3.System management permission, system administrator has the power to set up, edit, remove various model transformers parameter settings and model configuration. 3.System management permission, system administrator has the power to set up, edit, remove various model transformers parameter settings and model configuration. Kɔn ye tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm tɛm A garantiya tɛ̈n yenë kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈ɛ̈k ye kɛ̈
4.Each test item can choose or block, and can set any arbitrary criteria to determine compliance, if the test result data exceeds the automatic sound and light alarm. 4.Each test item can choose or block, and can set any arbitrary criteria to determine compliance, if the test result data exceeds the automatic sound and light alarm.
5. strong data management function, you can query each model transformer stator's monitoring data results (by model, number, date, item, qualification) and other conditions, and form a statistical report, and include production and qualification rate statistical functions. 5. strong data management function, you can query each model transformer stator's monitoring data results (by model, number, date, item, qualification) and other conditions, and form a statistical report, and include production and qualification rate statistical functions.
Онлайн разпит
