High Speed Railway Listing System
Train operation control system is one of China's high-speed rail core technologies, and LITIM through introducing digestive absorption and independent research and development, mastered the complete independent intellectual property of train operation control system core technology, developed the design of CTCS-2 level, CTCS-3 level, train autonomous driving system, related products all passed the highest safety level certification (SIL4 level) of European authority.
Hetime CTCS-2 level train operation control system, based on track circuit and point transponder to transmit list control information, and using target distance mode to monitor train safe operation system, suitable for operational needs of 200-250 km/h lines, while meeting the operational needs as 300Km/h and above lines CTCS-3 level backup mode. Hetime CTCS-2 level train operation control system, based on track circuit and point transponder to transmit list control information, and using target distance mode to monitor train safe operation system, suitable for operational needs of 200-250 km/h lines, while meeting the operational needs as 300Km/h and above lines CTCS-3 level backup mode.
CTCS-3 level train operation control system, based on wireless closure center (RBC) and GSM-R to achieve vehicle-land train control information dual-direction transmission, and using target distance continuous speed control mode to monitor train safe operation, suitable for operational needs of 300-350 km hour speed lines. CTCS-3 level train operation control system, based on wireless closure center (RBC) and GSM-R to achieve vehicle-land train control information dual-direction transmission, and using target distance continuous speed control mode to monitor train safe operation, suitable for operational needs of 300-350 km hour speed lines.
China National Railway Group Co., Ltd. ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye k
