Zhejiang Natural Fluid Technology Co., Ltd. ye
Kuæa>Proizvodi>Hotel Oil Pool Restaurant Oil Water Separation Equipment
Grupe proizvoda
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
    18968884911
  • Адрес
    Wenzhou, Zhejiang, Yongjia County, Wenzhou, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang
Kontakt sada
Hotel Oil Pool Restaurant Oil Water Separation Equipment
All stainless steel overflow part design, anti-corrosion emergency solution design complete, cleaning waste oil simple and clean
Detalji proizvoda

Produk Profile

Integrated Oil Water Separation EquipmentEeKɔmpaniɛn ye baara kɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tEquipment install below the ground, dining wastewater through its own flow to the equipment, insulating oil lifting equipment through oil and water separation technology, to collect oil and fat separation, to lift the wastewater to the ground pipe network. Equipment install below the ground, dining wastewater through its own flow to the equipment, insulating oil lifting equipment through oil and water separation technology, to collect oil and fat separation, to lift the wastewater to the ground pipe network The equipment oil and water separation precision high, environmental protection performance good, integrated structure, no need to build a new oil separation pool, compact structure, covering a small area, saving investment, stainless steel integrated, clean hygiene, automation operation, easy daily management. The equipment oil and water separation precision high, environmental protection performance good, integrated structure, no need to build a new oil separation pool, compact structure, covering a small area, saving investment, stainless steel integrated, clean hygiene, automation operation, easy daily management.

ZRGY series oil and water separation equipment overall structure consists of three parts systems: ZRGY series oil and water separation equipment overall structure consists of three parts systems: ZRGY series oil and water separation equipment overall structure consists of three parts systems: ZRGY series oil and water separation equipment overall structure consists of three parts:Sisitɛm ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r Na cï pii ye kɔnɔ̈ɔ̈ŋ bɛ̈n lɔ̈ɔ̈m në ɣän ke kɔnɔ̈ɔ̈ŋ (ɣän ke kɔnɔ̈ɔ̈ŋ), ka kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ Na cï yen lɔ̈ɔ̈m në ɣän ke rou (ɣän ke kɔc cï kek ya tɔ̈ɔ̈u), ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic, ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic, ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic, ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic, ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic. Ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ Pii ye cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk Equipment collection domestic and foreign advanced technology, through automatic debris removal sorting method + gravity separation method + corridor type and arc-breathing drainage + oil floating setting combined, waste water through 5-8 level depth treatment, oil and water separation equipment effect is superior to the national level three emission standards. Equipment collection domestic and foreign advanced technology, through automatic debris removal sorting method + gravity separation method + corridor type and arc-breathing drainage + oil floating setting combined, waste water through 5-8 level depth treatment, oil and water

Model maana

隔油型号意义.png

Faa'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a

Integrated Oil Water Separation Equipmentkä puɔth

Efficiency:A kɔnɔ pump ye kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ. A nyuɔɔth tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n

Kontrol design complete:Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ

Design Flexible:Equipment entry, exit direction, structure, box size etc. can be customized according to the site conditions. Equipment entry, exit direction, structure, box size etc. can be customized according to the site conditions. Equipment entry, exit direction, structure, box size etc. can be customized according to the site conditions.

Lifetime kaam:JYWQP type, with automatic mixing sediment together discharge function, waste cutting together discharge function, internal cycle cooling lower water level stop pump function, stop pump water level low can discharge more water at a time, reduce water pump start times, extend water pump service life. JYWQP type, with automatic mixing sediment together discharge function, waste cutting together discharge function, internal cycle cooling lower water level stop pump function, stop pump water level low can discharge more water at a time, reduce water pump start times, extend water pump service life.

Departement of Equipment Investment: Departement of Equipment Investment: Departement of Equipment Investment: Departement of Equipment Investment: Departement of Equipment Investment: Departement of Equipment Investment:A sɔrɔ ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u

Sanitary wala polusi:SUS304 ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈

Pipe ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n:Kä ye kek looi aye kek looi në SUS304 stainless steel seamless tube. Fɛɛr ye luɔ̈ɔ̈i kɛ fɛɛr ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈

Gas ye kɔnɔ:Lɔ̈k ventilation hole ka tɔ̈u nhial tank, ka tɔ̈u ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ

Ajuiɛɛr ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n:Walasa ka bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈

A ɣän thiin koor:Equipment integrated integrated design, occupying a small area, saving space. Equipment integrated integrated design, occupying a small area, saving space. Equipment integrated design, occupying a small area, saving space.

Installation and repair is easy: Kuen-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛnA tɛ̈n koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor

Lɔ̈ɔ̈ŋ maji:A tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ

Lɔ̈ɔ̈m ye yic:Lɔ̈k valve, ka tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ

Luɔi ye looi:A cɔl cone structure in the bottom of the box, can beLɔ̈ɔ̈m de mïïth ye tɔ̈ɔ̈u në ye mɛn, ku lɔ̈ɔ̈m de mïïth ye tɔ̈ɔ̈u në ye mɛn, ka mïïth ye tɔ̈ɔ̈u në ye mɛn.

Ajuiɛɛr de micro-bubbleA lëu bɛ̈n looi bɛ̈ɛ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈

Selection

Integrated Oil Water Separation EquipmentLuɔiRange

Municipal engineering: airport, train station, agency cafeteria, commercial buildings: catering, hotels, adjunct food processing.

Fɛɛr: 50HZ ± 2%

Tɛmɛ: 0-400 ℃

Medium PH range: 5-9

Voltage: 380V ± 5%

Lɔ̈ɔ̈i: 0m3/h-150m3/h

Lifting range: 10m-28m

Parametre luɔɔi

IntegrasiɔnEquipment for oil and water separationDetail parameters:

Serial No

Model masin

Traffic rated

Yangzheng

Pump Power

Puwol Heater

Tank Volume

Import pipe diameter

Pipe diameter

(m3/h)

(m)

(kw)

(kw)

(L)

Dn(mm)

Dn(mm)

1

ZRGY-7

7

15

1.5

1

1550

100

50

2

ZRGY-7

7

22

2.2

1

1550

100

50

3

ZRGY-10

10

15

1.5

1

1550

100

50

4

ZRGY-10

10

22

2.2

1

1550

100

50

5

ZRGY-15

15

15

1.5

1

1850

100

65

6

ZRGY-15

15

22

2.2

1

1850

100

65

7

ZRGY-20

20

15

2.2

1

2550

125

65

8

ZRGY-20

20

20

3

1

2550

125

80

9

ZRGY-25

25

15

3

1

3400

125

80

10

ZRGY-25

25

22

4

1

3400

125

80

11

ZRGY-30

30

15

4

1.5

4200

125

100

12

ZRGY-30

30

25

5.5

1.5

4200

125

100

13

ZRGY-35

35

15

4

1.5

4450

150

100

14

ZRGY-35

35

22

5.5

1.5

4450

150

100

15

ZRGY-40

40

15

4

1.5

5400

150

100

16

ZRGY-40

40

22

7.5

1.5

5400

150

100

17

ZRGY-50

50

15

5.5

1.5

6530

200

100

18

ZRGY-50

50

22

7.5

1.5

6530

200

100

19

ZRGY-55

55

15

5.5

1.5

6920

200

100


Luɔi

IntegrasiɔnEquipment for oil and water separationLëk ba luɔɔi:

1. tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë

2. Kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi.

3.The equipment's inlet and exit water port should install the gate valve, so that equipment debugging and repair. 3.The equipment's inlet and exit water port should install the gate valve, so that equipment debugging and repair;

4.Equipment ventilation pipe should be connected to outdoor or to building drainage system ventilation pipe. 4.Equipment ventilation pipe should be connected to outdoor or to building drainage system ventilation pipe. 4.Equipment ventilation pipe should be connected to outdoor or to building drainage system ventilation pipe.

5. Pii bɛ̈n tɔ̈ɔ̈u në ɣän kɔ̈k yiic, ago pii bɛ̈n tɔ̈ɔ̈u në ɣän kɔ̈k yiic, pii bɛ̈n tɔ̈ɔ̈u në ɣän kɔ̈k yiic, ku pii bɛ

6.When equipment is installed in a pit type, you need to pre-set a reserved pit. 6.When equipment is installed in a pit type, you need to pre-set a reserved pit. 6.When equipment is installed in a pit type, you need to pre-set a reserved pit. Lɔ̈k ka tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n

7.Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Man holes and climbing setups should be convenient to daily carrying barrels. Man holes and climbing setups should be convenient to daily carrying barrels. Man holes and climbing setups should be convenient to daily carrying barrels.

8.When equipment repair, open human hole cover after half hour ventilation, before you can operate on it. 8.When equipment repair, open human hole cover after half hour ventilation, before you can operate on it. 8.When equipment repair, open human hole cover after half hour ventilation, before you can operate on it.

9. Pit ka 500 * 500 * 500mm drainage pit, ka pomp ye kɔc kony tääu, ago käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke

10. Kä wɛrɛ, tɛ̈n ye wɛ̈t ye kɔɔrɔ, tɛ̈n ye kɔɔrɔ, tɛ̈n ye kɔɔrɔ, tɛ̈n ye kɔɔrɔ.


Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!