Produk Profile
Integrated Oil Water Separation EquipmentEeKɔmpaniɛn ye baara kɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tEquipment install below the ground, dining wastewater through its own flow to the equipment, insulating oil lifting equipment through oil and water separation technology, to collect oil and fat separation, to lift the wastewater to the ground pipe network. Equipment install below the ground, dining wastewater through its own flow to the equipment, insulating oil lifting equipment through oil and water separation technology, to collect oil and fat separation, to lift the wastewater to the ground pipe network The equipment oil and water separation precision high, environmental protection performance good, integrated structure, no need to build a new oil separation pool, compact structure, covering a small area, saving investment, stainless steel integrated, clean hygiene, automation operation, easy daily management. The equipment oil and water separation precision high, environmental protection performance good, integrated structure, no need to build a new oil separation pool, compact structure, covering a small area, saving investment, stainless steel integrated, clean hygiene, automation operation, easy daily management.
ZRGY series oil and water separation equipment overall structure consists of three parts systems: ZRGY series oil and water separation equipment overall structure consists of three parts systems: ZRGY series oil and water separation equipment overall structure consists of three parts systems: ZRGY series oil and water separation equipment overall structure consists of three parts:Sisitɛm ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r Na cï pii ye kɔnɔ̈ɔ̈ŋ bɛ̈n lɔ̈ɔ̈m në ɣän ke kɔnɔ̈ɔ̈ŋ (ɣän ke kɔnɔ̈ɔ̈ŋ), ka kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ŋ ye kɔnɔ̈ɔ̈ Na cï yen lɔ̈ɔ̈m në ɣän ke rou (ɣän ke kɔc cï kek ya tɔ̈ɔ̈u), ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic, ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic, ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic, ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic, ka tɛ̈n yenë kɔc cï kek ya tɔ̈ɔ̈u në ɣän ke rou yiic. Ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ, ka tɛmɛ Pii ye cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk cɔk Equipment collection domestic and foreign advanced technology, through automatic debris removal sorting method + gravity separation method + corridor type and arc-breathing drainage + oil floating setting combined, waste water through 5-8 level depth treatment, oil and water separation equipment effect is superior to the national level three emission standards. Equipment collection domestic and foreign advanced technology, through automatic debris removal sorting method + gravity separation method + corridor type and arc-breathing drainage + oil floating setting combined, waste water through 5-8 level depth treatment, oil and water
Model maana
Faa'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a
Integrated Oil Water Separation Equipmentkä puɔth:
Efficiency:A kɔnɔ pump ye kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ. A nyuɔɔth tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
Kontrol design complete:Ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
Design Flexible:Equipment entry, exit direction, structure, box size etc. can be customized according to the site conditions. Equipment entry, exit direction, structure, box size etc. can be customized according to the site conditions. Equipment entry, exit direction, structure, box size etc. can be customized according to the site conditions.
Lifetime kaam:JYWQP type, with automatic mixing sediment together discharge function, waste cutting together discharge function, internal cycle cooling lower water level stop pump function, stop pump water level low can discharge more water at a time, reduce water pump start times, extend water pump service life. JYWQP type, with automatic mixing sediment together discharge function, waste cutting together discharge function, internal cycle cooling lower water level stop pump function, stop pump water level low can discharge more water at a time, reduce water pump start times, extend water pump service life.
Departement of Equipment Investment: Departement of Equipment Investment: Departement of Equipment Investment: Departement of Equipment Investment: Departement of Equipment Investment: Departement of Equipment Investment:A sɔrɔ ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u ka tɔ̈u
Sanitary wala polusi:SUS304 ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈r ye kɛ̈ɛ̈
Pipe ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n:Kä ye kek looi aye kek looi në SUS304 stainless steel seamless tube. Fɛɛr ye luɔ̈ɔ̈i kɛ fɛɛr ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈
Gas ye kɔnɔ:Lɔ̈k ventilation hole ka tɔ̈u nhial tank, ka tɔ̈u ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ̈u piny ka tɔ
Ajuiɛɛr ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n ye kɛ̈n:Walasa ka bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈i bɛ̈ɛ̈
A ɣän thiin koor:Equipment integrated integrated design, occupying a small area, saving space. Equipment integrated integrated design, occupying a small area, saving space. Equipment integrated design, occupying a small area, saving space.
Installation and repair is easy: Kuen-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛn-kuɛnA tɛ̈n koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor koor
Lɔ̈ɔ̈ŋ maji:A tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ̈n yenë yen tɛ
Lɔ̈ɔ̈m ye yic:Lɔ̈k valve, ka tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ
Luɔi ye looi:A cɔl cone structure in the bottom of the box, can beLɔ̈ɔ̈m de mïïth ye tɔ̈ɔ̈u në ye mɛn, ku lɔ̈ɔ̈m de mïïth ye tɔ̈ɔ̈u në ye mɛn, ka mïïth ye tɔ̈ɔ̈u në ye mɛn.
Ajuiɛɛr de micro-bubble:A lëu bɛ̈n looi bɛ̈ɛ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈
Selection
Integrated Oil Water Separation EquipmentLuɔiRange:
Municipal engineering: airport, train station, agency cafeteria, commercial buildings: catering, hotels, adjunct food processing.
Fɛɛr: 50HZ ± 2%
Tɛmɛ: 0-400 ℃
Medium PH range: 5-9
Voltage: 380V ± 5%
Lɔ̈ɔ̈i: 0m3/h-150m3/h
Lifting range: 10m-28m
Parametre luɔɔi
IntegrasiɔnEquipment for oil and water separationDetail parameters:
Serial No |
Model masin |
Traffic rated |
Yangzheng |
Pump Power |
Puwol Heater |
Tank Volume |
Import pipe diameter |
Pipe diameter |
(m3/h) |
(m) |
(kw) |
(kw) |
(L) |
Dn(mm) |
Dn(mm) |
||
1 |
ZRGY-7 |
7 |
15 |
1.5 |
1 |
1550 |
100 |
50 |
2 |
ZRGY-7
|
7 |
22 |
2.2 |
1 |
1550 |
100 |
50 |
3 |
ZRGY-10
|
10 |
15 |
1.5 |
1 |
1550 |
100 |
50 |
4 |
ZRGY-10
|
10 |
22 |
2.2 |
1 |
1550 |
100 |
50 |
5 |
ZRGY-15
|
15 |
15 |
1.5 |
1 |
1850 |
100 |
65 |
6 |
ZRGY-15
|
15 |
22 |
2.2 |
1 |
1850 |
100 |
65 |
7 |
ZRGY-20
|
20 |
15 |
2.2 |
1 |
2550 |
125 |
65 |
8 |
ZRGY-20
|
20 |
20 |
3 |
1 |
2550 |
125 |
80 |
9 |
ZRGY-25
|
25 |
15 |
3 |
1 |
3400 |
125 |
80 |
10 |
ZRGY-25
|
25 |
22 |
4 |
1 |
3400 |
125 |
80 |
11 |
ZRGY-30
|
30 |
15 |
4 |
1.5 |
4200 |
125 |
100 |
12 |
ZRGY-30
|
30 |
25 |
5.5 |
1.5 |
4200 |
125 |
100 |
13 |
ZRGY-35
|
35 |
15 |
4 |
1.5 |
4450 |
150 |
100 |
14 |
ZRGY-35
|
35 |
22 |
5.5 |
1.5 |
4450 |
150 |
100 |
15 |
ZRGY-40
|
40 |
15 |
4 |
1.5 |
5400 |
150 |
100 |
16 |
ZRGY-40
|
40 |
22 |
7.5 |
1.5 |
5400 |
150 |
100 |
17 |
ZRGY-50
|
50 |
15 |
5.5 |
1.5 |
6530 |
200 |
100 |
18 |
ZRGY-50
|
50 |
22 |
7.5 |
1.5 |
6530 |
200 |
100 |
19 |
ZRGY-55
|
55 |
15 |
5.5 |
1.5 |
6920 |
200 |
100 |
Luɔi
IntegrasiɔnEquipment for oil and water separationLëk ba luɔɔi:
1. tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë
2. Kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi.
3.The equipment's inlet and exit water port should install the gate valve, so that equipment debugging and repair. 3.The equipment's inlet and exit water port should install the gate valve, so that equipment debugging and repair;
4.Equipment ventilation pipe should be connected to outdoor or to building drainage system ventilation pipe. 4.Equipment ventilation pipe should be connected to outdoor or to building drainage system ventilation pipe. 4.Equipment ventilation pipe should be connected to outdoor or to building drainage system ventilation pipe.
5. Pii bɛ̈n tɔ̈ɔ̈u në ɣän kɔ̈k yiic, ago pii bɛ̈n tɔ̈ɔ̈u në ɣän kɔ̈k yiic, pii bɛ̈n tɔ̈ɔ̈u në ɣän kɔ̈k yiic, ku pii bɛ
6.When equipment is installed in a pit type, you need to pre-set a reserved pit. 6.When equipment is installed in a pit type, you need to pre-set a reserved pit. 6.When equipment is installed in a pit type, you need to pre-set a reserved pit. Lɔ̈k ka tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n
7.Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Man holes and climbing setups should be convenient to daily carrying barrels. Man holes and climbing setups should be convenient to daily carrying barrels. Man holes and climbing setups should be convenient to daily carrying barrels.
8.When equipment repair, open human hole cover after half hour ventilation, before you can operate on it. 8.When equipment repair, open human hole cover after half hour ventilation, before you can operate on it. 8.When equipment repair, open human hole cover after half hour ventilation, before you can operate on it.
9. Pit ka 500 * 500 * 500mm drainage pit, ka pomp ye kɔc kony tääu, ago käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke
10. Kä wɛrɛ, tɛ̈n ye wɛ̈t ye kɔɔrɔ, tɛ̈n ye kɔɔrɔ, tɛ̈n ye kɔɔrɔ, tɛ̈n ye kɔɔrɔ.