

A. Bayan
A. Luɔi:
Masin kënë ye luɔ̈ɔ̈i bï kɔc ya tɛ̈n yenë kɔc ya tɛ̈n yenë kɔc ya tɛ̈n yenë kɔc ya tɛ̈n yenë kɔc ya tɛ̈n yenë kɔc
II. Prinsip:
Kä ye kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek tɛ̈n yenë kek
A, tɛ̈n kɛ standard
Ajuiɛɛr kënë cɔl: QB/T 2922-2007.
3Instrument Description
A.Ajuiɛɛr (Figure 1)

(Foto 1)
II.Control Panel (foto)2)


(Foto)2)
3Kä ye kek looi (Table 1)
Proyek |
Specifications |
Yɔɔr de impact |
4 inch (0-6 inch lëu bï ya waar) |
Vibration Method |
Spring 1.79Kg/mm <Note: Spring use times are 100,000> |
Kɔntaa |
LED, 1 ~ 9,999,999 ye, a tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n |
Tɛst Speed |
10~30 r/min lëu bï ya waar |
Metode sensing |
Optoelectric Induction, Sample Drop Automatic Stop |
Masin size |
(L×W×H) 1400×1200×2500mm |
Power |
1∮, AC220V,50Hz |
Weight (approx.) |
300 kg |
(Tabel 1)
Kuen, Instrument Installation
A. Power condition: Please configure the correct power supply according to the name tag on the machine.
|
Risk: ■ Lɔ̈ɔ̈i de voltage de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈i de lɔ̈ɔ̈ |
2, luɔɔi de ɣän ye kɔɔrɔ: ɣän ye kɔɔrɔ, ɣän ye kɔɔrɔ, ɣän ye kɔɔrɔ <85% RH;
A diŋ, a ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ.
Wu、Operating Specifications
1. Tɛɛr
1, tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ̈r tɛ̈ɛ
2, tïŋ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈ lɔnadɛ̈;
3, Connect power supply, open power switch, power light light; 3, Connect power supply, open power switch, power light light; 3, Connect power supply, open power switch, power light light; 3, Connect power supply, open power switch, power light light; 3, Connect power supply, open power switch
4, ka tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛm
5, ka cɛ̈ɛ̈k ka cɛ̈ɛ̈k ka cɛ̈ɛ̈k ka cɛ̈ɛ̈k ka cɛ̈ɛ̈k ka cɛ̈ɛ̈k ka cɛ̈ɛ̈k ka cɛ̈ɛ
6, press the start key, the panel on the start indicator lights, and this time the test begins. 6, press the start key, the panel on the start indicator lights, and this time the test begins.
a、 Na yïn wïc ba tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
b、 Tɛ̈n yenë kɛ̈ɛ̈k looi, të cenë kɛ̈ɛ̈k ye tɔ̈ɔ̈u, a tɛ̈n yenë kɛ̈ɛ̈k ye tɔ̈ɔ̈u, a tɛ̈n yenë kɛ̈ɛ̈k ye tɔ̈ɔ̈u;
7, të cenë wɛ̈t cï kek ya looi ya tɔ̈ɔ̈u, masin abï ya tɔ̈ɔ̈u;
8, ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛmɛ ka tɛ Na yɔ̈ɔ̈r y tɔ̈ɔ̈u power switch, na yɔ̈ɔ̈r y tɛmɛ.
9, tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ tɛmɛ
