Zhejiang Natural Fluid Technology Co., Ltd. ye
Kuæa>Proizvodi>Kä ye kek tɛ̈n ye kek tɛ̈n ye kek tɛ̈n ye kek tɛ̈n ye kek tɛ̈n ye kek tɛ̈n
Grupe proizvoda
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
    18968884911
  • Адрес
    Wenzhou, Zhejiang, Yongjia County, Wenzhou, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang, Zhejiang
Kontakt sada
Kä ye kek tɛ̈n ye kek tɛ̈n ye kek tɛ̈n ye kek tɛ̈n ye kek tɛ̈n ye kek tɛ̈n
All stainless steel overflow part design, anti-corrosion emergency solution design complete, cleaning waste oil simple and clean
Detalji proizvoda

Produk Profile

Oil-water separatorA ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈

Equipment install below the ground, dining wastewater through its own flow to the equipment, insulating oil lifting equipment through oil and water separation technology, to collect oil and fat separation, to lift the wastewater to the ground pipe network. Equipment install below the ground, dining wastewater through its own flow to the equipment, insulating oil lifting equipment through oil and water separation technology, to collect oil and fat separation, to lift the wastewater to the ground pipe network The equipment oil and water separation precision high, environmental protection performance good, integrated structure, no need to build a new oil separation pool, compact structure, covering a small area, saving investment, stainless steel integrated, clean hygiene, automation operation, easy daily management. The equipment oil and water separation precision high, environmental protection performance good, integrated structure, no need to build a new oil separation pool, compact structure, covering a small area, saving investment, stainless steel integrated, clean hygiene, automation operation, easy daily management.

Model maana

隔油型号意义.png

Faa'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a'a

Efficiency:Oil-water separatorA kɔnɔ pump ye kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ kɔnɔ. A nyuɔɔth tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n tɛ̈n

Control design complete: when the temperature is low oil condensation, after heating it is easy to separate and collect oil and water, control system automatically monitors liquid level, temperature, automatic heating, temperature reaching school automatically stops heating. Control design complete: when the temperature is low oil condensation, after heating it is easy to separate and collect oil and water, control system automatically monitors liquid level, temperature, automatic heating, temperature reaching school automatically stops heating.

Design Flexible: Equipment entry, exit direction, structure, box size etc. can be customized according to the site conditions.

Long service life: drainage pump selected for JYWQP type, with automatic mixing deposits together discharge function, waste cutting together discharge function, internal cycle cooling lower water level stop pump function, stop pump water level low can discharge more water at a time, reduce water pump start times, extend water pump service life.

Equipment Investment Province: No need to build oil separation pools, reduce investment, and equipment installation is flexible and easy. Equipment Investment Province: No need to build oil separation pools, reduce investment, and equipment installation is flexible and easy.

Sanitary no pollution: SUS304 material stainless steel closed water tank, ensuring waste water is released in sealed state, clean, no pollution. Sanitary no pollution: SUS304 material stainless steel closed water tank, ensuring waste water is released in sealed state, clean, no pollution.

Pipe ye kɔnɔ: Pipe ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ ye kɔnɔ. Fɛɛr ye luɔ̈ɔ̈i kɛ fɛɛr ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈r ye dɔ̈ɔ̈

Gɛɛr dɔ̈ɔ̈r: Gɛɛr dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈

Lɔ̈ɔ̈i de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor de koor.

A ɣän thiin koor:Oil-water separatorEquipment integrated integrated design, occupying a small area, saving space. Equipment integrated integrated design, occupying a small area, saving space. Equipment integrated design, occupying a small area, saving space.

Installation and repair is easy: Small size, drainage pump uses automatic coupling system to install and disassemble is easy, and repair is easy. Installation and repair is easy: Small size, drainage pump uses automatic coupling system to install and disassemble is easy, and repair is easy.

Lɔ̈ɔ̈i ku nji: Lɔ̈ɔ̈i ku nji: Lɔ̈ɔ̈i ku nji: Lɔ̈ɔ̈i ku nji: Lɔ̈ɔ̈i ku nji: Lɔ̈ɔ̈i ku nji: Lɔ̈ɔ̈i ku nji: Lɔ̈ɔ̈i ku nji

Lɔ̈ɔ̈i ye thiin koor: Lɔ̈ɔ̈i valve, ka tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n

Lɔ̈ɔ̈i de mïïth: tɛ̈n ye cɔl cone structure, ye mïïth tɔ̈ɔ̈u thïn, ye mïïth tɔ̈ɔ̈u thïn, ye mïïth tɔ̈ɔ̈u thïn, ye mïïth tɔ̈ɔ̈u thïn.

Micro bubble ventilation device: a bɛ se ka looi ka bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye bɛ̈ɛ̈r ye

Selection

Municipal Engineering: Airport, Train Station, Authority Dining Buildings: Catering, Hotels, Supplementary Food Processing

Data kɛnɛya:

Fɛɛr: 50HZ ± 2%

Tɛmɛ: 0-400 ℃

Medium PH range: 5-9

Voltage: 380V ± 5%

Lɔ̈ɔ̈i: 0m3/h-150m3/h

Lifting range: 10m-28m

Parametre luɔɔi

Serial No

Model masin

Traffic rated

Yangzheng

Pump Power

Puwol Heater

Tank Volume

Import pipe diameter

Pipe diameter

(m3/h)

(m)

(kw)

(kw)

(L)

Dn(mm)

Dn(mm)

1

ZRGY-7

7

15

1.5

1

1550

100

50

2

ZRGY-7

7

22

2.2

1

1550

100

50

3

ZRGY-10

10

15

1.5

1

1550

100

50

4

ZRGY-10

10

22

2.2

1

1550

100

50

5

ZRGY-15

15

15

1.5

1

1850

100

65

6

ZRGY-15

15

22

2.2

1

1850

100

65

7

ZRGY-20

20

15

2.2

1

2550

125

65

8

ZRGY-20

20

20

3

1

2550

125

80

9

ZRGY-25

25

15

3

1

3400

125

80

10

ZRGY-25

25

22

4

1

3400

125

80

11

ZRGY-30

30

15

4

1.5

4200

125

100

12

ZRGY-30

30

25

5.5

1.5

4200

125

100

13

ZRGY-35

35

15

4

1.5

4450

150

100

14

ZRGY-35

35

22

5.5

1.5

4450

150

100

15

ZRGY-40

40

15

4

1.5

5400

150

100

16

ZRGY-40

40

22

7.5

1.5

5400

150

100

17

ZRGY-50

50

15

5.5

1.5

6530

200

100

18

ZRGY-50

50

22

7.5

1.5

6530

200

100

19

ZRGY-55

55

15

5.5

1.5

6920

200

100

Drawings Struktur

Luɔi

1.Oil-water separatorSa tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yenë tɛ̈n yen

2. Kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi në kë de kä ye kek looi.

3.The equipment's inlet and exit water port should install the gate valve, so that equipment debugging and repair. 3.The equipment's inlet and exit water port should install the gate valve, so that equipment debugging and repair;

4.Equipment ventilation pipe should be connected to outdoor or to building drainage system ventilation pipe. 4.Equipment ventilation pipe should be connected to outdoor or to building drainage system ventilation pipe. 4.Equipment ventilation pipe should be connected to outdoor or to building drainage system ventilation pipe.

5. Pii bɛ̈n tɔ̈ɔ̈u në ɣän kɔ̈k yiic, ago pii bɛ̈n tɔ̈ɔ̈u në ɣän kɔ̈k yiic, pii bɛ̈n tɔ̈ɔ̈u në ɣän kɔ̈k yiic, ku pii bɛ

6.When equipment is installed in a pit type, you need to pre-set a reserved pit. 6.When equipment is installed in a pit type, you need to pre-set a reserved pit. 6.When equipment is installed in a pit type, you need to pre-set a reserved pit. Lɔ̈ɔ̈m de kaam de kaam de kaam de kaam, tïŋ kaam de kaam de kaam de kaam de kaam de kaam de kaamLɔ̈ɔ̈ŋ ë piny;

7.Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Equipment install reserve pit upper cover requires easy opening. Man holes and climbing setups should be convenient to daily carrying barrels. Man holes and climbing setups should be convenient to daily carrying barrels. Man holes and climbing setups should be convenient to daily carrying barrels.

8.When equipment repair, open human hole cover after half hour ventilation, before you can operate on it. 8.When equipment repair, open human hole cover after half hour ventilation, before you can operate on it. 8.When equipment repair, open human hole cover after half hour ventilation, before you can operate on it.

9. Pit ka 500 * 500 * 500mm drainage pit, ka pomp ye kɔc kony tääu, ago käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke käke

10. Kä wɛrɛ, tɛ̈n ye wɛ̈t ye kɔɔrɔ, tɛ̈n ye kɔɔrɔ, tɛ̈n ye kɔɔrɔ, tɛ̈n ye kɔɔrɔ.

Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!