Yiguang Thermal Metering Technology Co., Ltd.
Kuæa>Proizvodi>YGM25 Stand-up Ultrasonic Meter
Informacije o firmi
  • Nivo transakcije
    Član VIP
  • Kontakt
  • Telefon
  • Адрес
    162-1 Jingshan Road, Lanshan District, Linyi, Shandong
Kontakt sada
YGM25 Stand-up Ultrasonic Meter
YGM ultrasonic thermal energy meter consists of flow sensors, paired temperature sensors and calculators, with a compact structure, easy installation
Detalji proizvoda
Detail

Teknik Features & Teknik Parameters

YGM ultrasonic thermal energy meter ye tɔ̈u në flow sensors, coupled temperature sensors ku calculators, ye tɔ̈u në compact structure, easy to install ku jɔl ya kä kɔ̈k peei (ye tɔ̈u në thermal energy meters ye cɔl thermal meters). Kä ye kek looi aye kek tɔ̈ɔ̈u në piezoelectric ceramic converter ye kɔc cɔl high precision and stability; No mechanical movement, no wear, no vulnerable to bad water quality and low maintenance costs. No mechanical movement, no wear, no vulnerable to bad water quality and low maintenance costs. No mechanical movement, no wear, no vulnerable to bad water quality and low maintenance costs. Can be installed horizontally or vertically, the rotatable surface can satisfy any viewing angle reading requirements, when installed can be installed according to different users' needs on the inlet water pipe or return water pipe (needs to be pre-selected). Can be installed horizontally or vertically, the rotatable surface can satisfy any viewing angle reading requirements, when installed can be installed according to different users' needs on the inlet water pipe or return water pipe (needs to be pre-selected). A ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye M-BUS, RS485 interface bɛ̈n lëu bɛ̈n ya mat në kë wïc kɔc dɛ̈t yiic, ago kɔc dɛ̈t ye kɔc dɛ̈t ye kɔc dɛ̈t ye kɔc dɛ̈t ye kɔc dɛ

Ajuiɛɛr de luɔɔi: Ajuiɛɛr de luɔɔi de tɛ̈n-tɛ̈n-tɛ̈n-tɛ̈n-tɛ̈n-tɛ̈n-tɛ̈nThermometer(CJ128-2007)


Proyek

Teknikal Parameters

NɔŋDɛɛrDiameterDN (mm)

15

20

25

32

40

50

Minimum flow qi(m)3/ h)

0.03

0.05

0.07

0.12

0.20

0.6

Flow ye kɔnɔ tɔ̈u qp(m)3/ h)

1.5

2.5

3.5

6

10

15

Max flow qs(m)3/ h)

3

5

7

12

20

30

Traffic Read ye dɔɔni(m)3)

999999.99

9999999.9

Kuen dɔ̈ɔ̈r dɔ̈ɔ̈r(kW·h)

9999999.9

99999999

Level of accuracy

Level 2 wala Level 3

Pressure Loss (Dɔɔr)

<25kPa/qp

Maximum pressure ye baara

1.6MPa

Temperature Range

4℃95℃

Temperature Difference

3K~60K (2K~60K wïc bï ya looi)

Temperature ɣän

Kategori A



Installation Use and Remarks (Lɔ̈ɔ̈i kɛ̈l kɛ̈l kɛ̈l kɛ̈l kɛ̈l kɛ̈l kɛ̈l)

1. Thermometer ye luɔɔi de model ye rot looi në kë de system flow ye rot looi në kë de system tube diameter ye rot looi në kë de flow size ye rot looi në kë de thermal meter ye rot looi në kë de diameter ye rot looi në kë de thermal meter ye rot looi

2.According to the heating partition measurement design requirements, a must install a filter before the hot meter enters the water. 2.According to the heating partition measurement design requirements, a must install a filter before the hot meter enters the water. Filter dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r.

3. Heat meter must be installed in horizontal direction or vertical direction, and heat meter identification arrow direction (including the filter) must be consistent with the direction of heating pipeline water flow. 3. Heat meter must be installed in horizontal direction or vertical direction, and heat meter identification arrow direction (including the filter) must be consistent with the direction of heating pipeline water flow. Pii dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r dɔ̈ɔ̈r Pii dɔ̈ɔ̈r adhil bɛ lɔ nhial të cenë yen tɔ̈ɔ̈u thïn.

4.Before you install the hot meter, you must clean the pipe before you install the hot meter, you must clean the pipe before you install the hot meter.

5.Hot meter inlet water end hot water ball valve allows only full open and full closed states, hot meter output water end hot water ball valve can be made flow adjustment.

6. Calculator (display) ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n ye tɛ̈n

7. Pii ye tɔ̈ɔ̈u ka cɔk tɔ̈ɔ̈u ka cɔk tɔ̈ɔ̈u ka cɔk tɔ̈ɔ̈u ka cɔk tɔ̈ɔ̈u.

8. Heat meter ye tɔ̈u kä ye kek tɔ̈u thïn, ka tɔ̈u thïn ka tɔ̈u thïn ka tɔ̈u thïn ka tɔ̈u thïn ka tɔ̈u thïn ka tɔ̈u thïn ka tɔ̈u thïn ka tɔ

9.To achieve thermal insulation and avoid human-made damage to the measuring system, you can install a thermometer counter box. 9.To achieve thermal insulation and avoid human-made damage to the measuring system, you can install a thermometer counter box. Na ye tɔ̈ɔ̈u në ɣän kɔ̈k yiic wala ɣän kɔ̈k yiic, ka tɛ̈ɛ̈u bï valves de pip ya tɔ̈ɔ̈u, ka tɛ̈ɛ̈u bï ya tɔ̈ɔ̈u bï ya tɔ̈

10.Ka cïn raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan ye raan

11.Optional RS485 interface function, wiring meaning is: red (+5V), white/yellow (B), green/blue (A), black (ground).

12.Some product specifications parameters can be changed without prior notice.


Онлайн разпит
  • Kontakti
  • Kompanija
  • Telefon
  • E-mail
  • WeChat
  • Kod provjere
  • Сједност поруки

Uspješna operacija!

Uspješna operacija!

Uspješna operacija!